Question Board — Siting and Supply

The questions that would actually move this case, each phrased so that a document could answer it.

OPEN QUESTION

Q1 — Basins

Are the largest AI campuses being built in basins already classified as water-stressed? Answerable from a site list cross-referenced against official drought and aquifer status.

Q2 — Supply type

For each major campus, is cooling water potable municipal supply, reclaimed non-potable supply, or groundwater? Answerable from utility agreements and permits.

Q3 — Withdrawal vs consumption

What are the actual withdrawal and consumption figures, reported separately, for a named site over a full year? Rarely published; sometimes obtainable from water district records.

Q4 — Does new cooling actually reduce freshwater dependence?

Measured, not announced: does a deployed closed-loop site show a reduced total footprint once the additional electricity and its embedded water are counted?

Q5 — Conflict

Where have local allocation disputes, moratoria or permit refusals actually occurred, and what did the deciding body give as its reason? Answerable from council minutes and permit decisions.

Q6 — Disclosure

Which operators publish site-level rather than fleet-level water data, and on what methodology? Fleet averages can conceal a stressed site inside a comfortable mean.